Strength testing at Industrial cables’ frequency 6,6 KV
Testing of switchboards with AC 50KV device.
Strength testing at Industrial cables’ frequency 20 KV at the premises of the Distribution Center 150/20 KV of the PPC in Vrilissia.
Strength testing at Industrial cables’ frequency 20 KV at the premises of the Distribution Center 150/20 KV of the PPC in Paleo Faliro.
Strength testing at Industrial cables’ frequency 20 KV at the premises of the Distribution Center 150/20 KV of DEPA in Megara.
Strength testing at Industrial cables’ frequency 11 KV at the premises of the Substation 150/20 KV of the power plant in Lavrio.
Strength testing at Industrial cables’ frequency 20 KV at the premises of the Distribution Center 150/20 KV of the PPC in Korydallos..
Strength testing at Industrial cables’ frequency 20 KV at the premises of the Substation 20/0,4 KV of SEMIRAMIS hotel in Kefalari, Kifissia.
Partial Discharge test at Medium Voltage submarine cable at ELPE in Thessaloniki.
LV cable fault localization.
MV cable fault localization.
Localization and repair of faults, measurements of active parts and cable sheaths at Medium Voltage cables.
Strength testing at Industrial cables’ frequency 20 KV at the premises of the Distribution Center 150/20 KV of the PPC in Vrilissia.
Localization and repair of faults, measurements of active parts and cable sheaths at Medium Voltage cables at Industrial Frequency and grounding measurement at the Aeolian park in Naxos island.
Strength testing at Industrial cables’ frequency 20 KV.
MV cable fault localization at the Aeolian Park in Mount Panachaiko.
Strength testing at Industrial cables’ frequency 20 KV at Elefsina Refinery.
MV cable fault localization at the Aeolian Park in Agia Efimia, Kefalonia.
MV Cable fault localizations at Aeolian and Photovoltaic Parks in the regions Kalloni, Trizinia, Kefalonia.
Cables’ testing with the methods VLF & PD.
MV cable fault localization at an Aeolian Park in Florina
Cables’ sheath fault localization and MV at an Aeolian Park in Cyprus.
Medium Voltage cables’ tests with the methods VLF & PD at an Aeolian Park under construction in the region of Viotia.
Cables testing with the VLF method and protection Relay testing at Photovoltaic Parks under construction.