Constructions of Substations – Electromechanical Projects Our company has carried out numerous projects related to electromechanical works. Below is an indicative list of projects

Renovation of Pharmacy. Architectural works for room configuration, installment of air conditioning systems, fire detection, firefighting, new complete electrical installation.

Installation of Substation that includes a Power Transformer 630 KVA with the corresponding MV cells and the LVGS

Construction of Substation that includes
-Two Power Transformers 1.600 KVA each.
-MV fields with the protective relays.
-LVGS, with section scales field, cosφ correction and the required automatisms and interconnections.
-LV general Switchboards of the buildings.
-Generator Sets.
2 of 250 KVA, 2 of 150 KVA, 3 of 80 KVA and 1 of 60 KVA

Partnership with ERETBO S.A. Installation of compact type Substation of 630 KVA with the Generator Set and the required additional electrical installations.

Planning, installation and arrangement of the secondary protection Relays of the MV fields of the Power Building and the power supply fields at the area next to the PPC.

Planning, design and installation of the automatic switch system of the two MV power supply provisions of the MV fields in the Power Building.

Planning and modification of the installation of the automatic switch system of the MV Security Network by the Main Supply to the 800 KVA generator set network.

Reconstruction of the MV switchboards

Planning and modification of the MV installations and the LVGS of the Company’s building in Peristeri.

Planning, replacement, extension of the old Substation’s MV fields.
Planning and construction of new Substation with MV of 800 KVA, MV field and LVGS.
Planning, design, installation and arrangement of the secondary protection relays of the two Substations 20 KV.
Planning and installation of a Generator Set of 630 KVA with the automation switchboards and transfer switch boards.

Installation of new Transformer 630 KVA and reconstruction of the LVGS.

Installation of a Substation with 2 Transformers of 630 KVA and one Generator Set of 250 KVA.

Replacement of the MV Fields and the LVGS.

a) Construction of three Substations of 630 KVA each, integrated in the Main power loop of the Physics & Mathematics Faculty.
b) Construction of Substation of 315 KVA integrated in the Security loop of the Physics & Mathematics Faculty.

Planning and installation of compact type Substation of 630 KVA with the Generator Set 450 KVA and the required additional electrical installations.

Installation of the new Generator Set of 250 KVA and the automatic control field –transfer switch of the emergency loads.

Replacement of Transformer of power of 1000 KVA.

Installation of Substation 500 KVA for the needs of the Depot TRAM.

Replacement of MV cables at the Olympic Stadium for the Olympic Games “ATHENS 2004”.

“Supply of equipment and performance of the works for the Project “Improvement and modernization of the Low Voltage Substation”

Construction of a Substation 3150 KVA for the elevation of voltage from the co-production and parallelism with PPC’s network at 20 KV.

Extension of the Medium Voltage Substation of the Data-processing Center building.

Construction of two Substations of 630 & 800 KVA each (New Halls of Residence) integrated in the power loop of the Theology Faculty.

Construction of two Substations of 1000 KVA each at the Beaches of Voula (former EOT A’ and B’ Beach)

Installation of Generator Set of 450 KVA with the corresponding automatic control switchboard and transfer switch of the emergency loads switchboard at the University of Athens, Informatics Department.

Installation of two Generator Sets of 800 KVA each, supply and installation of the corresponding automatic control switchboards and transfer switch of the loads switchboards of the Generator Sets up to the departure fields.

Installation of system of monitoring the voltage difference and short-circuit of the returns and the earth of the continuous to the Substations.

In collaboration with TERNA S.A.: Construction of Substation of Power 2.500 KVA

Replacement of Power Transformer and reconstruction of the LV switchboard of the Substation 12.2

Construction of Substation of 800 KVA for the needs of the satellite antennas

Supply and installation of two (2) failover Generator Sets of power 400 KVA each

Replacement of two Transformers of power 800 KVA, installation of LV cables for the network’s reinforcement, planning and installation of circuits of protection and interconnection of the MV and LV circuit breakers.

Replacement of MV and LV fields at the Substation.

Supply and replacement of soundproofed Generator Set of power 125 KVA with the automatism and load transfer switch switchboard.

Installation of Substation 20 KV in metal house for the connection of the 2 Substations in the depot of Elliniko.

Electromechanical Works for the extension of the Terminal of Liquefied Natural Gas at the facilities of D.E.P.A. in Revythousa Island, Megara.

Renovation of space of 250m2. Architectural works for room configuration, installment of air conditioning systems, fire detection, firefighting, new complete electrical installation.

Replacement of Medium Voltage fields, construction of new terminal boxes and reconnection of the MV field.

Installation of four (4) Substations in Egnatia Street.

Installation of five (5) Substations at Aktio airport.

Supply, planning and installation of system for the interconnection of the two (2) Electrical Power units with the PPC of power 6,5 MVA each.

Supply, planning and installation of system for the interconnection of one (1) Electrical Power unit with the PPC of power 500 KVA.

Supply, planning and installation of system for the interconnection of one (1) Electrical Power unit with the PPC of power 500 KVA.

Construction of terminal boxes and couplings in the Aeolian Park in Distomo, Viotia.

Works at the Substation of Thessaloniki Police Headquarters.

Supply and Installation of Generator Set 800KVA

Supply and Installation of Generator Set 800KVA

Supply and replacement of Medium and Low Voltage switchboards.

Supply and replacement of Medium Voltage switchboards at the Central Substation.

Supply and replacement of Medium Voltage switchboards at the THAVN Substation.

Electromechanical works for installation and connection of lifting Generator Set in PPC plants at the islands Mytilini, Mykonos.

Supply, installation and connection of circuit between 2 new buildings in the University Campus of Rhodes island.